POWER EVALUATION
This is he results from the first run of the power evaluation. It doesn't look too bad, but could be better.
Of course the main load is the Electric Heat Pump/Furnace. Maybe the air handler will be changed this year, to a more efficient model. Well pump and Hot water heater is a must, but possibly SHW soon as well.